Accurate Safety was delighted to supply more than 1km of edge protection for the Stage 2 development of the southern part of the former runway at Hong Kong's old Kai Tak Airport site.
An urban development, the work involves the design and construction of approximately 1.7km of dual two-lane district distributor roads, 590m of single two-lane access roads with vehicular underpass, and other associated works such as footpaths, noise barriers, sewerage and drainage.
The CEC-CCC joint venture is worth HK$1.947bn (US$251.17m) and expected to take 46 months to complete.
Accurate Safety provided the Accurate Safety Post and Panel system, which is secured to concrete with one thunderbolt or drop-in anchor.